Upgrading the heating in an older house works best in the right order: first understand the building and its heat demand, then reduce losses where it makes sense (roof, windows, pipes), then replace the heat generator with a system sized for the improved building. If the boiler must be replaced before insulation work, choose a system that can cope with lower demand later, such as a modulating heat pump. Radiators often need only selective upgrades to work with a heat pump. In Ticino, cantonal energy rules and available subsidies shape the decisions, so a plan covering several years is valuable.

Step 1: understand the building

  • Fuel consumption over several years.
  • Construction, insulation, windows and roof.
  • Heating system: boiler, radiators, pipes.
  • Damp or comfort problems.
  • Planned changes in use or layout.

An energy certificate with an advisory report gives a structured overview and suggests priorities.

Step 2: the right order for upgrading the heating in an older house

Situation Recommended approach
Boiler works, renovation planned Insulation first, then a smaller heat generator
Boiler failing, no renovation planned Heat pump with selective radiator upgrades
Boiler failing, renovation in a few years Modulating system that suits both current and future demand
Heritage or technical constraints Tailored solution, possibly a transitional hybrid

Step 3: radiators and flow temperature

Older houses often have radiators sized for high temperatures. With balancing and a few larger radiators in critical rooms, many can work at lower flow temperatures suitable for a heat pump. A test lowering the heating curve during cold weather shows which rooms need attention.

Step 4: replace the heat generator

When replacing the heat generator in an existing residential building in Ticino, at least 10% renewable energy is required, met through accepted standard solutions or admitted alternatives. A heat pump meets this. Check the programme conditions and apply within the deadlines: starting work before a decision may cost you the subsidy. The process is described in replacing an oil boiler with a heat pump.

Step 5: fine-tune

After installation, adjust the heating curve over the first winter, check comfort in each room and review consumption. Many systems can run at lower temperatures than first set.

Quick wins

  • Insulate heating and hot water pipes in unheated spaces.
  • Seal draughts around windows and doors.
  • Insulate the attic floor if accessible.
  • Balance the heating system.
  • Service the existing boiler.

Planning over several years

Few owners can do everything at once. A multi-year plan sets priorities and ensures each step fits the next. For example: year one, roof insulation and balancing; year two, heat pump; year three, windows. Subsidy and tax rules may favour certain combinations, so check before deciding the sequence.

Damp and comfort

Older Ticino houses, especially stone houses, can suffer from damp. Insulation must be planned carefully to avoid trapping moisture. Heating evenly and ventilating well help keep walls dry.

Example: 1960s house in Locarno

An owner wants to modernise. The oil boiler still works, and the roof is poorly insulated. The plan: roof insulation and balancing in the first year, which reduces demand; in the second year, an air-source heat pump sized for the improved building, with two radiators enlarged. Subsidies are obtained for both steps.

Hot water in the plan

Hot water is often forgotten when upgrading heating. An old electric boiler or a tank heated by the oil boiler should be considered in the plan. With a heat pump, hot water is usually produced by the same system with a new tank. Including it from the start avoids a second project later and makes the most of subsidies.

Working with one partner

An older house raises many interconnected questions: insulation, moisture, radiators, heat source, hot water, electrics. Working with a partner who looks at the whole picture, and who coordinates with other specialists where needed, avoids decisions that clash with each other.

Common mistakes

  • Replacing the heating first, then insulating, leaving an oversized system.
  • Assuming all radiators must be replaced.
  • Internal insulation of stone walls without moisture analysis.
  • Skipping fine-tuning after installation.

Buildings constructed before 1990: asbestos and hazardous substances

Before demolition, chasing, core drilling or any work on materials in a building constructed before 1990, the possible presence of hazardous substances, including asbestos, must be checked (for example in tile adhesives, plaster, fillers, floor coverings or pipe insulation). These checks come before the work starts; asbestos is not just a surprise to handle on site. If materials are suspected, work stops and the required procedure is followed with recognised specialists, as Suva requires.

Frequently asked questions

Should I insulate before installing a heat pump?

Ideally yes, but if the boiler fails first, a well-chosen modulating system can bridge the gap.

Can old radiators work with a heat pump?

Often, sometimes after selective upgrades and balancing.

Where do I start?

With an assessment of the building and its consumption.

Heating upgrades in Ticino

AcquaKlima Sagl plans and carries out heating upgrades in older houses across Ticino. Learn more about heating and heat pumps or get in touch.